Q.  Critical Path Net Work helps an engineer_________________?

a. to concentrate his attention on critical activities
b. to divert the resources from non-critical advanced activities to critical activities
c. to be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
d. all of the above
e. none of the above


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  The technique for establishing and maintaining priorities among the various jobs of any project is known as___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement about relationship between various floats______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Critical path moves along the activities having total float of_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The critical path of a network represents_______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The critical activity has____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The probability distribution of project completion in PERT follows following distribution_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The difference between the time available to do the job and the time required to do the job, is known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A dummy activity________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Routing assists engineers in deciding in advance___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The disadvantage of product layout is_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct step used for scheduling a project by C.P.M.__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Bar charts are suitable for_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In perpetual inventory control, the material is checked as it reaches its__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The reasons which are basically responsible for the formation of a queue should be that ___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT stands for k (fit) project evaluation and review technique__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT is the__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Work study comprises following main techniques_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  CPM is the___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT and CPM are__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts