Q.  Critical path moves along the activities having total float of_____________________?

a. positive value
b. negative value
c. zero value
d. same value
e. none of the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  The two-bin system is concerned with_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The linear programming techniques can be applied successfully to industries like_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The mathematical technique for finding the best use of limited resources in an optimum manner is known as___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In A-B-C control policy, maximum attention is given to__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  One of the basic essentials of an incentive plan is that_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following is not wage incentive plan_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the incorrect statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A file removes the metal during___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In a _____________ , both cutting and non-cutting operations are performed at one station of the press in every stroke of the ram?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A neutral flame is obtained by supplying___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The cold working of metals is carried out_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Lancing is the operation of _________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In spot welding, the spacing between two spot weld should not be less than _______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The shrinkage allowance for cast iron pattern is________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Tandem drawing of wires and tubes is necessary because_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The operation of straightening a curved sheet metal, is known as____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts