Strength of Materials Mcqs


Q.  Coulomb friction is the friction between_________________?

a. bodies having relative motion
b. two dry surfaces
c. two lubricated surfaces
d. solids and liquids
e. electrically charged particles


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  According to principle of moments_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  According to law of triangle of forces______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Two non-collinear parallel equal forces acting in opposite direction________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The magnitude of two forces, which when acting at right angle produce resultant force of VlOkg and when acting at 60° produce resultant of Vl3 kg. These forces are____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a scalar quantity__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The forces, which meet at one point, but their lines of action do not lie in a plane, are called______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not the unit of pressure ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The unit of work or energy in S.I. units is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is a weakness of bar chart ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a PERT event ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The area under the Beta – distribution curve is divided into two equal parts by_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following does not represent an activity?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Latest start of an activity is always________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Whenever an activity has zero total float, then_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Critical path_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The reduction in project time normally results in_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The process of incorporating changes and rescheduling or replanning is called_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm