MCQs: The concrete work for the following part of the building of specified thickness is measured in square metres_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The measurement is made for stone work in square metre in case of________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The expected out turn of 12 mm plastering with cement mortar is_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Carpet area does not include the area of_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The inspection pit or chamber is a manhole provided in a base drainage system________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The ‘centre line method’ is specially adopted for estimating_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The unit of measurement is per quintal for the following?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The order of booking dimensions is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The correct Prismoidal formula for volume is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the incorrect statement regarding a master trap from the following ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: period in a septic tank is assumed___________________?
The detention
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the item of work not included in the plinth area estimate______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The minimum width of a septic tank is taken__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The brick work is measured in sq metre, in case of_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The item of steel work which is measured in sq.m, is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|