Software Management Mcqs


Q.  COCOMO was developed initially by _____________________ ?

a. B.Beizer
b. Rajiv Gupta
c. B.W.Bohem
d. Gregg Rothermal


ANSWER: See Answer
 
Barry Boehm introduced a hierarchy of software estimation models bearing the name COCOMO, for COnstructive COst MOdel
MCQs:  The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not considered as a risk in project management ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  A 66.6% risk is considered as__________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Quality planning is the process of developing a quality plan for__________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The process each manager follows during the life of a project is known as ___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What describes the data and control to be processed ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is incorrect activity for the configuration management of a software system ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not project management goal ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Identify the sub-process of process improvement ___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What type of software testing is generally used in Software Maintenance ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which selective retest technique selects every test case that causes a modified program to produce a different output than its original version?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Regression testing is a very expensive activity?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which regression test selection technique exposes faults caused by modifications ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not an appraisal cost in SQA ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISO 9001, the causes of nonconforming product should be____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The CMM emphasizes____________________?
Category: Software Engineering Mcqs,   Published by: teswesm