Software Management Mcqs


Q.  CLSS stands for_____________________?

a. conveyor line sorting system
b. conveyor line sorting software
c. conveyor line sorting speed
d. conveyor line sorting specification


ANSWER: See Answer
 
The conveyor line sorting system (CLSS) sorts boxes moving along a conveyor line. Each box is identified by a barcode that contains a part number and is sorted into one of six bins at the end of the line.
MCQs:  Which regression test selection technique exposes faults caused by modifications ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not an appraisal cost in SQA ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISO 9001, the causes of nonconforming product should be____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The CMM emphasizes____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  ISO 9001 is not concerned with _______________ of quality records?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  CMM stands for_____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Who identifies, documents, and verifies that corrections have been made to the software ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not included in External failure costs ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which requirements are the foundation from which quality is measured ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Degree to which design specifications are followed in manufacturing the product is called_________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not included in failure costs ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The Capability Maturity Model (CMM) is a continuous model ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is not included in prevention costs ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  CO policy in CMM means___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a maturity level in CMM ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
Category: Software Engineering Mcqs,   Published by: teswesm