MCQs: The main factor to be considered while preparing a detailed estimate, is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The plinth area of a building not includes_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: While estimating the qualities for the construction of a building, the correct metric unit is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The brick work is not measured in cu m in case of_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The assumption on which the trapezoidal formula for volumes is based, is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: According to Indian Standards Institute, the actual size of modular bricks is_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The cross -sections for a highway is taken at_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In the mid-section formula__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Brick walls are measured in sq. m if the thickness of the wall is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the correct statement regarding the centre line method of estimating a building?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The following item of earth work is not measured separately ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The area of the cross-section of a road fully in banking shown in the given figure, is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The measurement is made in square metre in case of_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Cost of fittings and their fixing is specified for the following sanitary fittings________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: For the construction of buildings, the subheads of the estimate are________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|