Q.  Batching refers to________________?

a. controlling the total quantity at each batch
b. weighing accurately, the quantity of each material for a job before mixing
c. controlling the quantity of each material into each batch
d. adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  An excavator costs Rs. 20,00,000/- and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing Reason R: If the angle of swing is decreased, the cycle time will be decreased_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  For a given size of bucket, the ideal output of a dragline will be least in_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following earth moving machines has the shortest cycle time?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Crash project duration is obtained by summing the________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The constraints in case of resource smoothening operation would be_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Slack time refers to_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Economic saving of time results by crashing_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The direct cost of a project with respect to normal time is________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The time with which direct cost does not reduce with the increase in time is known as_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What estimate would you give for the variance in above problem ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The independent float affects only_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Free float for any activity is defined as the difference between__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Total float for any activity is defined as the difference between________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Free float is mainly used to_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively___________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  In the network shown in Fig. (15 fig) the latest start time of an activity 4-5 is_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts