Software Reliability & Fault Tolerance Mcqs


Q.  A system maintaining its integrity while accepting a temporary halt in its operation is said to be in a state of___________________?

a. Full Fault Tolerance
b. Graceful Degradation
c. Fail Soft
d. Fail Safe


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  What information is required to process a change to a baseline ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  According to Pareto’s principle, x% of defects can be traced to y% of all causes. What are the values of x and y ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is Six Sigma ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a core step of Six Sigma ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What kind of quality cost is incurred when an error is detected in a product prior to shipment ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Non-conformance to software requirements is known as___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The degree to which the design specifications are followed during manufacturing is known as________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISO 9001, inspection and testing comes under which management responsibility ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  When code is made available to others, it goes in a/an____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a main phase in Configuration Management (CM) Process ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  SCM stands for_________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is validating the completeness of a product ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is a collection of software elements treated as a unit for the purposes of SCM ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is one or more software configuration items that have been formally reviewed and agreed upon and serve as a basis for further development ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is group with the responsibility for reviewing and approving changes to baselines ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is a specific instance of a baseline or configuration item ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a part of Software Configuration Management Basics ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is a software process ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not included in Issues Meetings ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a conflict in software development team ?
Category: Software Engineering Mcqs,   Published by: teswesm