Q.  A particle moves along a straight line such that distance (x) traversed in t seconds is given by x = t2 (t – 4), the acceleration of the particle will be given by the equation_________________?

a. 3t2-lt
b. 3t2+2t
c. 6f-8
d. 6f-4
e. 6t2-8t


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Two non-collinear parallel equal forces acting in opposite direction________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The magnitude of two forces, which when acting at right angle produce resultant force of VlOkg and when acting at 60° produce resultant of Vl3 kg. These forces are____________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a scalar quantity__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The forces, which meet at one point, but their lines of action do not lie in a plane, are called______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not the unit of pressure ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The unit of work or energy in S.I. units is________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is a weakness of bar chart ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a PERT event ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The area under the Beta – distribution curve is divided into two equal parts by_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following does not represent an activity?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Latest start of an activity is always________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Whenever an activity has zero total float, then_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Critical path_____________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The reduction in project time normally results in_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The process of incorporating changes and rescheduling or replanning is called_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The normal time required for the completion of project in the above problem is_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Updating may result in_________________?