Software Management Mcqs

Q.  A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?

a. JAD
b. CLASS
c. FAST
d. None of the mentioned


ANSWER: See Answer
 
Facilitated application specification techniques (FAST), this approach encourages the creation of a joint team of customers and developers who work together to identify the problem, propose elements of the solution, negotiate different approaches, and specify a preliminary set of requirements.
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Regression testing is a very expensive activity?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which regression test selection technique exposes faults caused by modifications ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not an appraisal cost in SQA ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  According to ISO 9001, the causes of nonconforming product should be____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The CMM emphasizes____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  ISO 9001 is not concerned with _______________ of quality records?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  CMM stands for_____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Who identifies, documents, and verifies that corrections have been made to the software ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not included in External failure costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which requirements are the foundation from which quality is measured ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Degree to which design specifications are followed in manufacturing the product is called_________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not included in failure costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The Capability Maturity Model (CMM) is a continuous model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is not included in prevention costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  CO policy in CMM means___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a maturity level in CMM ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts